In short
RAMS combine a risk assessment, which identifies the hazards and how they are controlled, with a method statement, which sets out how the job will be done safely, step by step. Principal contractors reject RAMS that are generic. Good RAMS describe this job, on this site, with these people.
The risk assessment
- The hazards of the task and the site.
- Who might be harmed, and how.
- The controls, working down the hierarchy: eliminate, substitute, engineer, organise, then protective equipment.
- What risk remains, and who checks the controls are in place.
The method statement
- The scope of the work and where it happens on site.
- The sequence of work, step by step.
- Plant, equipment and materials.
- People, competence and supervision.
- Permits needed, such as hot works, confined spaces or excavations.
- Access, exclusion zones and how you interface with other trades.
- Emergency and rescue arrangements.
- Environmental controls for dust, noise, waste and spills.
Why RAMS get rejected
- Copied from another job, with the wrong site details.
- No clear sequence of work.
- Controls that do not match the hazards.
- Missing lifting plans, permits or rescue plans.
- Not signed off, or never briefed to the team.
Make them work on site
- Brief the RAMS to the team before work starts, and record who attended.
- Keep a copy where the work is happening.
- Stop and review if the method or conditions change.
Note: Risk assessment is a legal duty for employers. Method statements are not required by law in the same way, but most clients and principal contractors ask for them to show a safe system of work.
Common questions
What is the difference between a risk assessment and a method statement?
A risk assessment works out what could cause harm and how to control it; a method statement describes, step by step, how the job will be done safely, with those controls built in (HSE, HSG150). Together they are known as RAMS. HSE says a method statement is an effective way of telling workers how the job should be done and the precautions to take.
Can I reuse RAMS from another job?
Only as a starting point. HSE says do not just copy an example risk assessment and put your company name on it, as that would not satisfy the law or protect your employees. A method statement for a repeated task may be similar from job to job, but it will need revising when circumstances change markedly (HSG150). Check every detail against this site, this job and this team.
Do workers have to sign RAMS?
Not by law. What the law requires is that employees get clear, relevant information on the risks found by the risk assessment and the measures that control them (regulation 10 of the Management of Health and Safety at Work Regulations 1999). Brief the RAMS before work starts, check people have understood, and record who attended. A signed briefing sheet is a simple way to keep that record.
What is the hierarchy of control?
The order in which to consider controls, from most to least effective: elimination (remove the hazard), substitution (replace it), engineering controls (isolate people from it), administrative controls (change the way people work), then personal protective equipment (HSE). HSE says PPE should be the last resort. Your RAMS should show you have worked down the list and only rely on PPE for the risk that remains.
Do I need a lifting plan for every lift?
Every lift must be planned, but not every lift needs a detailed written plan. Every lifting operation using lifting equipment must be properly planned by a competent person, appropriately supervised and carried out safely (regulation 8 of the Lifting Operations and Lifting Equipment Regulations 1998). HSE says a simple, routine lift may need only minimal on-the-job planning by trained people, while a complex lift needs detailed planning and records.
Do RAMS need a rescue plan?
Yes, for any work at height. Planning work at height must include planning for emergencies and rescue (regulation 4 of the Work at Height Regulations 2005). Your RAMS should say how you would reach and recover someone, such as a worker left hanging in a harness, with the equipment and trained people in place before work starts. Plan rescue for other high-risk work too, such as confined spaces.
What should I do if the job on site does not match the RAMS?
Stop and review before carrying on. You must review a risk assessment if there is reason to think it is no longer valid, or there has been a significant change, and make any changes needed (regulation 3 of the Management Regulations 1999). Update the method statement, brief the team on what has changed and record the briefing before work restarts.
How NXT-HSE can help
NXT-HSE can write or review RAMS around how the job is really done, and update them in response to a principal contractor's comments. Your legal duties stay with your business.
Sources
- HSE: managing risks and risk assessment at work
- HSE: using a health and safety consultant
- HSE: risk assessment template and examples
- HSE: Health and safety in construction (HSG150)
- HSE: managing risk using PPE
- Management of Health and Safety at Work Regulations 1999
- HSE: LOLER overview
- Work at Height Regulations 2005, regulation 4
Sources checked 28 September 2026 against current Health and Safety Executive guidance and legislation. This guide is general information, not legal advice; your legal duties stay with your business.